Click to enlarge
Click to enlarge Click to enlarge Click to enlarge
Click to enlarge Click to enlarge Click to enlarge

Thistle Hotel Kensington


Client: Guoman Hotels Limited

Project: Thistle Hotel, London

Contract Duration: 12 Months

Bar and Restaurant Refurbishment

Install Electrical Contractors Limited recently completed the refurbishment of the bar and restaurant area at the Thistle Hotel Kensington. The works consisted of a new lighting/emergency lighting scheme which incorporates an intelligent lighting system which gives the end user total ambient lighting control of all the bar and restaurant area. It also gives the end user various preset scenes. There was also a new small power installation to serve bar and restaurant areas. Other works completed in this area was new hot and cold water services to servery units above ground drainage and removal of live heating pipes. All the works were completed while the hotel was in full service.

Reception Area

Install Electrical Contractors Limited recently completed the refurbishment of the reception and concierge area at the Thistle Hotel Kensington. The works consisted of a new lighting /emergency lighting scheme, installation of two number chandeliers, small power installation to reception and concierge desk and new hot and cold water services to newly formed disabled toilet and waste services. All the works were completed while the hotel was in full service.

Bedrooms

Install Electrical Contractors Limited recently completed the refurbishment of 174 bedrooms at the Thistle Hotel Kensington. The works consisted of a new sub-main infrastructure to serve all nine floors and the installation of new final circuits to serve all bedrooms/ corridors, lighting and emergency lighting scheme and the installation of new pipe work and above ground drainage to serve each bedroom along with the installation of new sanitary ware.

 

Copyright © Install Electrical Contractors Ltd 2011 | Site Map | Webmaster | Web Design by Starlite